Skip to main content

Washington, DC Bathroom Remodel

Complete bathroom remodel, which included a repositioning of tub, sink and toilet from one side of the room to the other. All fixtures, lighting, flooring and tile and corner storage closet are new installations. The claw foot tub was retained from the original designed and refinished.

Bathroom Remodel